Public Contents of Environmental Information of Key Sewerage Units
NO.1 Basic information
Unit Name: Guangdong Mingxuan Industrial Co. Ltd..
Registered Address: No. 10 Pingdong Industrial Park Industrial First Road, Yangjiang High-tech District
Industry Category: Flat Glass Manufacturing
Production scale: 1 × 1000t/d high quality floating glass production line
Location: No. 10, Industrial Park No. 1, Pingdong Industrial Park, Gaoxin District, Yangjiang
Uniform social credit code: 9144170690490448R
Legal representative: Zeng Chaoxuan
Technical Officer: Gengsenben
Fixed telephone: 0662-3827779
Mobile: 157182925
NO.2 Sewage information
1) Information Table on Sewage Nodes, Contaminants and Pollution Control Facilities of Exhaust Products of Major Contaminants Melting Kilns
sequence number
Production facility number
Name of production facility(1)
Name of corresponding decontamination link(2)
Type of pollutant(3)
Emissions Forms(4)
Pollution treatment facilities
Organised vent number(6)
Whether vent settings meet requirements(7)
Type of vent
Other information
Pollution Control Facility Number
Name of pollution treatment facility(5)
Whether it is a feasible technology
Additional information on pollution treatment facilities
1 Melt Kiln 1 # Glass Melt Kiln Melted Sulphur dioxide Organised Desulfuration Tower 1-1 # Flue gas circulating fluidized bed desulphurization technology is the backup system DA 001 is the main outlet 2 Melt Kiln 1 # Glass Melt Kiln Melted Sulphur Sulphur Melting Tower 1-2 # Limestone / Lime -gypsum desulphurization technology is desulphurization and dust-integrated main desulphurization and dust-removal environmental protection facility DA 001 is the main discharge port 3 melting kiln 1 # glass melting kiln particulate matter organized cloth bag dust collector 1-1 # bag dust collector is the bag material PTFEDA001 is the main discharge outlet 4 Melting Kiln 1 # Glass Melting Kiln Melting Nitrogen Oxide Organised Denitrification Reactor 1-1 # Selective Catalytic Reduction(SCR) is the main discharge port of DA 001
2, pollutant discharge implementation standards
Requirements of the Standard Limits for Emissions of Air Pollutants from the Tablet Glass Industry(GB26453-2011).
3.Total approved emissions
Total NOx control indicator(t/a)
701
Melting kiln flue gas
Total smoke control indicator(t/a)
57
Melting kiln flue gas
Total sulphur dioxide control indicator(t/a)
214
Melting kiln smoke
NO3. Construction and Operation of Pollution Prevention and Control Facilities
Guangdong Mingxuan Industrial Co. Ltd. has invested 120 million yuan in energy conservation and environmental protection in strict compliance with environmental protection emission standards, and has built energy conservation and environmental protection facilities such as flue gas residual heat power generation, dust removal, desulphurization and denitrification. External flue gases meet the requirements of the Standard Emission Standards for Air Pollutants in the Flat Glass Industry(GB26453-2011).
In order to ensure the continuous and stable operation of environmental protection facilities and further reduce the emission concentration, the company cooperated with Beijing Beiqing Environmental Protection Engineering Co., Ltd. in 2017 to build a wet desulphurization system, and the desulphurization and dust removal facilities achieved the effect of one use and one preparation. In May 2018, the denitrification system was upgraded and modified, and the high-temperature electrostatic precipitator system was constructed by Aerospace Kaitian Environmental Protection Technology Co., Ltd..
On December 29, 2016, the company was approved by the Guangdong Provincial Environmental Protection Department to approve the Environmental Protection filing of the project. "Letter of the Guangdong Provincial Environmental Protection Department on the Environmental Impact Assessment Report of the 1000t/d Quality Floating Glass Construction Project of Guangdong Mingxuan Industrial Co., Ltd.."(Guangdong Huanshi[2016] 715); On January 18, 2017, it was awarded the "Guangdong Provincial Pollutant Emission License" issued by the Yangjiang City Environmental Protection Bureau; On December 20, 2017, it obtained a new national version of the "sewage permit."
We will establish a cleaner production system and an environmental emergency management system, and entrust Yangjiang AFC Energy Technology Service Co., Ltd. with the preparation of the Clean Production Audit Report. Entrusted Guangzhou Lanyibao environmental protection technology Co., Ltd. to prepare the "emergency plan for environmental emergencies." We will establish a general industrial solid waste and hazardous waste management system.
1, environmental equipment process flow chart
2. environmental protection facilities are now planned
Residual heat power generation
Semi-dry desulphurization and dust removal SCR denitrification
Wet desulphurization Construction of high temperature electrostatic precipitator
Online monitoring facility vFlue gas pollutant discharge outlet
NO4. Environmental Impact Assessment of Construction Projects and Other Environmental Protection Administrative Permits
1, Yangjiang Environmental Technology Center approved the "Letter on the Evaluation of the Environmental Impact Report of Guangdong Mingxuan Industry Co., Ltd. 2 × 1000t/d Quality Floating Glass Construction Project" No. 85.
2, Guangdong environmental protection department agreed to the project environmental protection record(Guangdong ring letter[2016] 715)
Sewerage permits
NO5. Emergency Plan for Environmental Accidents
In 2017, he commissioned Lanyibao to prepare the "Emergency Plan for Environmental Emergencies" and has now sent it to the Environmental Protection department for the record.
Other environmental information to be disclosed
Monitoring Report on Flue Gas in Melt Kiln